FBOs at Dundee EGPN DND
1 FBO at this airport, and handling here is mandatory.
Airport details
Category B — Extra considerations required
- No runway with unrestricted take-off and landing
- Non-standard approach pattern
- Unusual characteristics or performance limitations
- Runway length may limit operations for certain aircraft types.
AI-assessed per AMC1 ORO.FC.105(b)(2) on 10 Oct 2026. Verify against current AIP before operational use.
| ICAO | EGPN |
|---|---|
| IATA | DND |
| Serves | Dundee |
| Country | United Kingdom |
| Elevation | 16 ft (5 m) |
| Approach | IFR available |
| Fuel on field | Jet A-1 |
| Prior permission | PPR required This Aerodrome is PPR. Light Aircraft by phone to ATC, all others by Fax to Flight Notifications or by email to InfoDundee@HIAL.co.uk. |
| Handling | Mandatory — you must use an FBO |
| Customs | Customs and immigration available, with limits |
| ATC | Limited |
| Runways | 09 1,319 m × 30 m asphalt PCN 30/F/C/Y/T 27 1,319 m × 30 m asphalt PCN 30/F/C/Y/T |
| Opening times | 02:20–05:44 Limited 05:45–19:59 Full 20:00–22:59 Limited 23:00–02:20 Limited Typical daily availability as at 3 Sep 2026, in local time. Not a substitute for the AIP — confirm before you plan on it. |
| Traffic accepted | Military, Helicopter, Training, General Aviation, Non Scheduled, Scheduled, Business Aviation |
Guidelines
No aviation guidelines published for United Kingdom yet.
Is one of these yours? Claim the listing free and confirm your services. It takes about twenty minutes and it is the only way to move up this list. Claim your FBO
